Skip Navigation
 
City Government

Cameron Street Closed for Bridge Rehabilitation


April 29, 2013 – Cameron Street between Balmoral Street and Vickers Street will be closed to through traffic starting Monday, May 6, for a period of approximately five months. The closure is required to permit rehabilitation to the bridge at this location. The work will consist of concrete repairs, water proofing and paving of the bridge deck, replacement of the railing system, and structural strengthening of the structure.

Local traffic will be able to access Cameron Street at Vickers and Balmoral Streets however through traffic will follow the posted detours.

Drive with extra care and watch for workers. We apologize for any inconvenience this may cause.

- 30 -

Contact:  Mike Vogrig, Project Coordinator - Engineering, 625-4321