The Thunder Bay Housing Community Improvement Plan allows the City to distribute Housing Accelerator dollars to successful applicants for eligible projects that build Thunder Bay by adding new residential units. The Multi-Unit Residential Grant is one of the grant streams these dollars can flow through.
About the Multi-Unit Residential Grant
The Multi-Unit Residential grant is intended to encourage the creation of well-constructed, sustainable, and safe projects where two or more self-contained units are built.
-
Grant value
-
100% of eligible costs up to a maximum of $25,000 per unit above the 70% maximum density of the zone
-
The total maximum value per property is up to $300,000
What does "above 70% maximum density of the zone" mean?
- Most homes in Thunder Bay are within the Urban Low-Rise Zone, which allows up to 6 units per lot. If your lot can support 6 units, you will be eligible to apply for $25,000 per unit above 4.2 units (70% of 6).
- If you build 5 units, you would be eligible to apply for funding for 0.8 units (5 units subtracted by 4.2 units), which would be $20,000 (0.8 multiplied by $25,000).
- Find out the zoning of your project by using the interactive zoning map
- To learn your maximum density, please contact Planning Services at 807-625-2216 or planning@thunderbay.ca
Project Eligibility
- Proposed density must be above 70% of the maximum density of the zone. The units eligible for the grant are only the units created above the 70% density threshold
-
Space and water heating must be electricity-based, or zero emissions, unless the applicant can communicate in writing why they are unable to meet this requirement. Relief of this requirement will be at the discretion of the Community Improvement Plan Implementation Staff. Applicants are encouraged to strive for net-zero or net-zero ready building performance in line with the City of Thunder Bay Net-Zero Strategy.
Eligible Costs
- Works related to the Ontario Building Code or Fire Code Compliance
- Structural
- Electrical
- Safe egress
- Ventilation
- Fire protection, including associated insulation
- Similar improvements
- Permanent finishing materials and decorative elements
- Construction materials
- Painting
- Drywall
- Trim
- Permanent light fixtures
- Flooring
- Countertops
- Cabinetry
- Costs for professional studies, plans, or designs
- Conceptual Plans
- Structural Analysis
- Traffic or parking study
- Site Plan Drawings
- Environmental Drawings
- Architectural studies
- Engineering Plans
- Interior Design Plans
- Market Analysis and/or Feasibility Study
- Other site-specific studies or plans which may be required or recommended by the City at the time of a pre-application submission meeting or pre-consultation under the Planning Act
Payment
This grant is paid after construction is completed on the project and the building permit has completed the final inspection and is closed per the building permit process.