In construction zones, reduce your speed while driving, stay alert, and watch for workers.
Want to stay posted on the latest road work? Sign-up to receive Road Work News through our subscribe page.
Check out the Construction Projects page for a map and full list of this season's capital projects.
Looking for information on the Edward & Redwood roundabout? Visit our Roundabout page to learn more.
Search
Section of James Street Closing Tuesday, August 4 for Line Painting
Posted on Friday, July 31, 2020 11:00 AM
Starting at 7 am on Tuesday, August 4, James Street between Frederica Street West and Kingston Street will be closed for line painting, if weather conditions permit. The road will re-open later in the day.
Motorists are asked to observe signage and drive with caution.
- 30 -
Contact: Matthew Miedema, Project Engineer - 625-3050
Lyon Boulevard West to Close to Traffic on Weekends
Posted on Thursday, July 30, 2020 08:30 AM
To encourage residents to be active outside while maintaining physical distance, Lyon Boulevard West will be closed to vehicular traffic every weekend until the end of September. Users of the multi-use trail on the west side of Boulevard Lake will be able to spread out and use the adjacent roadway.
The closures will take place Fridays at approximately 4 pm through Mondays at 7 am. Road closure signs and barricades will be placed at the intersection of Arundel Street and at the north entrance of the...
One Lane of John Street Road Closed at Mercier Street July 28
Posted on Monday, July 27, 2020 07:15 AM
From 6 am to 8 pm on Tuesday, July 28, one lane of John Street Road will be closed to eastbound traffic at Mercier Street for the installation of new sewer and water infrastructure. A detour will direct all eastbound traffic to Hutton Park Drive.
Eastbound traffic originating from Chercover Drive will be directed west to the detour.
Westbound traffic on John Street Road will not be affected by the closure.
Motorists are asked to drive with...
2020 Road Work Season Continues
Posted on Thursday, July 23, 2020 12:30 PM
The City of Thunder Bay is investing $18 million in 2020 on road and sidewalk rehabilitation, residential paving, sanitary and storm sewers, water main repair/replacement, bridge and culvert work, and streetlight renewal. Road work can result in road closures, detours and delays for drivers. All residents are reminded to reduce their speed, be alert, watch for workers and drive with extra care in construction zones. The following areas are scheduled for, or are currently undergoing, road and other...
One Lane of Cumberland Street Bridge to Accommodate Pedestrians
Posted on Thursday, July 23, 2020 08:00 AM
Starting Friday, July 24, the outside lane of Cumberland Street North, southbound over the Current River Bridge, will be closed to vehicle traffic to accommodate pedestrians walking the loop around Boulevard Lake.
This safety measure is undertaken due to increased foot traffic over the bridge during the current closure of the Boulevard Lake Dam Walkway. The closure of the lane to vehicle traffic and its availability to pedestrians will continue until the Boulevard Lake Dam Walkway is reopened, which...
Contact Us